TWIN CITY A1
Location
Prievozská ul., Bratislava
Project developer
HB REAVIS
Karadžičova 12, Bratislava
the scope of implementation by nectel
Complex design and execution of solution
Low voltage installations – execution of the following activities
- Structured cabling systems
- Telecommunication network and equipment
- Optical distribution frames
- Electrical fire alarm systems (EFA)
- Voice fire alarm systems signalization (VFA)
- Electric security system (ESS)
- Access control system (ACS)
- Closed-circuit television (CCTV)
- Door communication system